SAFER|GREENER|STREAMLINED
Explore Katoni's transformative journey through compelling narratives on our 'Case Studies' page, showcasing innovative solutions and successful partnerships in the engineering sector.
Katoni had been assisting the OES with ongoing cyber compliance services when a request by the Competent Authority to resubmit their Cyber Assessment Framework was received.
Katoni provided the design and managed the installation of a temporary diesel generation solution to Serica Energy to reduce carbon emissions during turnaround (TAR) periods.
Study for Electrification of Gas Export Compressor (UKCS)
Arc Flash Study & Hazard Reduction Implementation
Switchboard Arc Flash detection system study
Another successful Arc Flash Hazard Reduction study
A study focused on layout and arrangement work for an FPSO concept.
Read about another successful study focused on Electrification in the UKCS.
Outlining a best in industry Functional Safety management approach.
We supported Dana to define the right solution for their Bittern production flowlines.
On Thursday, 5th September 2024, we hosted our inaugural Suppler Engagement Event & Annual Awards at Pittodrie Stadium.
Cove Rangers saw defeat against Aberdeen FC in a testimonial match at Balmoral Stadium to celebrate 10 seasons of service from Katoni employee Blair Yule.
Katoni & AFC Youth Academy’s popular elite 5v5 indoor tournament returns to action this weekend (27th Jan 2024) for a sixth consecutive year.
Katoni supports North East of Scotland Tennis Championships in December 2023.
A case study to replace a Diesel Centrifuge for Repsol (UKCS)
Supporting Teekay with modifications, TAR support and more.
The Foinaven was the first FPSO to be located in the waters West of Shetland.
Read about this brownfield modification on the Foinaven FPSO.
The Banff was operated by CNR, another successful Katoni project.
The Hummingbird was located on Chestnut field for Spirit Energy.
The now decommissioned Banff FPSO was located 200 miles of Aberdeen.
Piper B platform is located in UKCS Block 15/17 and is 120 miles off Aberdeen.
This project focused on successfully delivering a new Turret Laydown area.
A wide ranging Water Injection FEED study by Katoni Engineering.
Another successfully delivered study focused on electrifying UKCS assets.
The design a replacement of manually operated diaphragm pumps.
Refining ‘start-up’ and ‘stay-up’ requirements for a gas deficient FPSO
Read about Helideck lighting support on the Tartan Alpha.
A study was driven by robust Power Systems Analysis.
Read about our work supporting an ICSS Upgrade on The Captain FPSO.
A successful Power Systems Study delivered for a North North Sea asset.
This study focused on a new FPSO, Mero 2 to be located offshore Brazil.
Read about another successful study focused on a Gas Deficiency issue.
Read all about this debottlenecking study on the Western Isles.
Read about another successful Structural modification in this case study.
A thrilling 5v5 tournament featuring elite U12 teams from Celtic, Dundee, Hamilton Accies, Hearts, Hibernian, Ross County, and Rangers at Aberdeen Sports Village—an afternoon cherished by all!
Energy Voice has once again covered a specialist service delivered by Katoni.
Katoni attended the annual Sevan User Forum June 21st – 23rd, 2022 in Arendal, Norway to present plans and concepts for electrification and emissions reduction.
Katoni has been announced as a winner of a major competition designed to reduce emissions across the UKCS.
Katoni has become an early adopter of quality framework SEQUAL.
The chance to help grow the company was the reason a trio of engineers left giant North Sea firms for relative newcomer Katoni Engineering.
Bosses at Katoni Engineering said the firm’s latest achievement shows smaller companies can be “industry-leading”
A former director at the Aberdeen and Grampian Chamber of Commerce (AGCC) has taken up a new role in the energy sector.
Katoni Engineering has again demonstrated its capability to deliver high quality services to the oil and gas sector by joining the Achilles FPAL Verify network.
Katoni painting a picture of operating differently
North Sea pilots face oil platform “black hole” effect when landing
A range of helideck modification and upgrade support projects.